West Ham Station Enhancement
Olympic Delivery Authority, procured the £3.7 million scheme to design temporary and permanent access structures to West Ham Station. The scheme provided a pedestrian route for travel between West Ham Station and The Greenway, for access to the Olympic Park. The temporary structures were dismantled post-Olympic Games and stored for possible re-use in the future. The Temporary footbridge with two flights of stairs over the West Ham District Line. The walkway was positioned on 50No Screw Piles, embedded in the East Bound LU Embankment.
My responsibilities included the design of the temporary footbridge over the Railway Tracks and the site technical supervision during installation. The bridge was erected during possessions weekend closures.

View of the supporting structure

Finite Element Analysis (LUSAS software) has been used to model the connections