Inspection & Condition Surveys
Experience in the inspection of bridges & structures in the railway environment including possessions.
Structures inspected include Highway Railway and Pedestrian Bridges, LUL railway structures, river wall. Structures comprise of steel, concrete and masonry.
Experience in liaising with Third-Party Authorities to plan works and ability to plan safe system of works and method statement.

Loughborough Junction
Condition survey
Pre-construction survey of masonry viaduct prior to construction works (industrial buildings)

Metronet Bridges & Structures Assessment Team
Various LUL Assets
Working for Metronet undertaking inspections and assessment of various LUL bridges & station structures

Crossrail Anglia
Principal Inspection
GRIP 4 Stage Principal Inspection to confirm condition and confirm remit for Station Enhancement Works
Devon House
Condition Survey of Thames River Wall
Condition survey to provide recommendations for repair works

London Road Bridge (Twickenham)
Pre-construction condition survey
Condition survey during standard railway traffic (Spans 1-2 and 6) and during T3 possessions (spans 2-4)

Aldgate Station
Principal Inspection
Inspection for Assessment of highway supporting overbridge